| Within-route error | Between-route error | Model building | ||||||
---|---|---|---|---|---|---|---|---|---|
 | B | SEM | β | B | SEM | β | B | SEM | β |
Sketch/verbal group | .16 | 3.70 | .01 | 1.66 | 3.75 | .04 | .03 | .06 | .05 |
Target details | − 2.17 | .98 | − .26* | − 2.05 | .99 | − .24* | .02 | .01 | .14 |
Route details | − 4.09 | 2.49 | − .19 | -4.48 | 2.52 | − .21 | .06 | .04 | .19 |