| Control | Verbal | Map | |||
---|---|---|---|---|---|---|
 | Time 1 M (SD) | Time 2 M (SD) | Time 1 M (SD) | Time 2 M (SD) | Time 1 M (SD) | Time 2 M (SD) |
Within-route error | 33.04 (19.29) | 24.83 (15.19) | 32.00 (19.38) | 27.44 (19.56) | 30.40 (15.00) | 24.74 (14.46) |
Between-route error | 61.54 (16.82) | 50.99 (23.21) | 58.35 (19.55) | 49.19 (22.05) | 59.84 (16.88) | 50.23 (18.29) |
Model-building accuracy | 0.49 (.29) | 0.57 (.30) | 0.45 (.30) | 0.55 (.31) | 0.49 (.29) | 0.77 (.21) |